|
Terrence Sullivan, Director
One Government Center, 3rd floor Fall River, MA 02722
T: 508-324-2321 | F: 508-324-2103
E:
This e-mail address is being protected from spambots. You need JavaScript enabled to view it
|
 |
 |
Fall River’s Sewer Commission is responsible for the Wastewater Collection and Treatment System.
Fall River’s system is primarily a Combined Sewer System transporting both sanitary and stormwater flows from approximately 75% of the sewered areas of the City.
These facilities have the capacity to collect, transport and treat dry-weather.
On average, 31-million gallons of sewage are treated per day. The peak hydraulic capacity for combined dry and wet-weather flow is 106-million gallons per day.
|